Godrej Parkshire features a RCC-framed structure with shear wall
technology, CCTV security, PVC-insulated copper wiring, BESCOM grid
power, and DG backup for lifts + common areas (100% backup as per
plan). The project, set on 13.5 acres, has 1130 apartments across 5
towers (2B + G + 28 floors) in Hoskote (Sarakariguttahalli, off NH 648,
Bengaluru 562114).
Specifications describe the complete set of materials and finishes used
in the construction, allowing buyers to assess the property’s build quality.
Builders usually include a specifications list so that buyers can know the
quality of the project.
The specifications of Godrej Parkshire will have world-class standards to
meet the latest trends. For a detailed overview of the materials that are
used in the project, you can refer to the Godrej Parkshire specifications
PDF provided by the builder on this website. (Project status: prelaunch;
RERA is in progress and due in Dec 2025.)
Structure: RCC + shear wall | Floor height: 2950 mm
Power: BESCOM + 3-phase | DG backup for lifts & common areas
(100%)
Security: 24×7 security + CCTV + intercom + video door phone
Sustainability: rainwater harvesting + STP + LED common lighting +
low-VOC paint
The Specifications for Godrej Parkshire Apartments Bangalore are:
Structure
RCC Framed Structure with shear wall technology
200mm for the external wall
100mm for internal wall
Floor to Floor Height is at 2950mm (2.95 m)
Service staircases and lobby are added with Kota Stone
Stylish lobby floors are given on the Ground floor
The basement flooring and upper floor lobby floors are added in vitrified tiles.
All lobby walls are given a mix of texture paint
Ceilings are given in distemper.
Lift cladding is given in granite based on the builder’s design. (Lifts are
planned across all 5 towers.)
For drinking water, an RO plug point is added
Plug points added in the utility area also
A modular kitchen provision is given
The countertop area is made of Marble
Enough Plugs are added in the kitchen for the fridge, mixie, and grinder
Space is given for the kitchen sink
For the kitchen floor, only the best quality tiles are used
Gas Provision added in the kitchen
Wall Finish is of tiles above the kitchen counter
For internal walls and ceilings, 2 coats of premium emulsion, 2 coats of putty, and 1 coat of primer are used.
For external walls, 2 coats of exterior emulsion paint and 1 coat of primer
Panel-type false ceiling for the toilet
Toilet wall finish: Matte finish ceramic tile of size 600x600mm up to
2450mm height
The colour of the walls is decided based on the architect's design intent.
Service lifts of appropriate capacity are added
High-speed passenger lifts are added in all 5 towers (2B + G + 28
floors)
Phone point and Internet point are given in the living room
The entry door is 8 feet tall, Vaastu-based entry
Sufficient light points and plug points are added for the living room
Rainwater Harvest pipes are used to save water
Sewage Treatment Plants are added to reuse treated water in the garden
Energy-efficient LED lights are added in all common areas
Low VOC paints added for healthy indoor air
Fire-rated doors are added at staircases with emergency exits
Fire hydrants were added on all the floors of the tower
An automatic smoke detector and a water sprinkler are added in the basements
Anti-skid tile floors in all balconies
The Cloth Drying hanger is on the balcony
MS handrail added as per the builder’s design intent
3 PHASE power connection is given
Electrical points are added in bedrooms and the Living room for AC
Fire Retardant copper wire is added to a quality brand
Enough light points and power plugs are added in all flats
Separate meters have been added in all flats
MCB and a Residual current circuit breaker are added for safety
All flats are added with modular switches in concealed wiring
USB provision added in the living room and in the bedrooms
Foot Lamp points added in all the bedrooms
Power source: BESCOM grid power + DG backup for lifts and common
areas
Exhaust fan point added in all bathrooms
All bathrooms with a wash basin and taps
PVC-coated false ceiling added for bathrooms
8 ft height frame shutters are added for bathroom doors
Soap cases and Towel rods in bathrooms
Ceramic tiles for the false ceiling and tiles for the flooring
Geyser points are given in all bathrooms
All Bathroom fittings are added with chrome-plated fittings
A trained security team is there at the entry 24*7
CCTV cameras are installed in all common areas
Intercom facilities and video door phones are provided
Security coverage is planned across common areas in all 5 towers.
An Internal Door with a flush shutter
The Main Door frame is made of Timber
A Quality Wood floor is added for all rooms
Wall Finish given in Acrylic Emulsion
The ceiling is made of oil-bound distemper
All Bedrooms are given with enough plugs, and an Internet point
UPVC is added for external doors
UPVC windows are given with clear glass
All Common areas are given with a 24*7 power supply
Lifts and common areas are added with 100% full power backup
Godrej Parkshire specifications reviews are positive, and buyers are
satisfied with the quality fittings and materials that are used in the
project. The latest eco-friendly features, like solar lamps, rainwater
harvest units, and sewage disposal methods, attract buyers. Overall, the
builder has selected only the best materials for this project to offer
durable living spaces to all buyers.
The project is planned on 13.5 acres with 1130 apartments across 5
towers (2B + G + 28 floors), and the specifications focus on RCC +
shear wall structure, 3-phase BESCOM power, CCTV security, and DG
backup for lifts + common areas.
FAQS
High-speed passenger lifts are planned in all 5 towers, and service lifts
are provided for goods movement as per the tower plan.
All flats have big windows and balconies to have better air flow and
sunlight throughout the year. Ventilation depends on the selected stack
and balcony placement shown in the approved floor plan.
There are car and 2-wheeler parking areas for all homebuyers so that
everyone can park their vehicles. (Final parking allotment is confirmed in
the cost sheet during booking.)
Every room is equipped with an adequate number of power outlets to
use all needed appliances, and enough light bulbs can be added. The
plan includes 3-phase connection, modular switches, USB points, and
AC points in bedrooms and the living room.
The project has 24/7 security at the entrance and exit doors. CCTV
monitoring is done in all common areas for extra safety. Fire safety
includes fire-rated doors at staircases, hydrants on all floors, and smoke
detectors + sprinklers in basements.